Insights
How to write a concept for a tender: Step-by-step guide, structural requirements, and practical examples for Bid Managers at a glance.


Tom Dietrich
Founding GTM Engineer

Key Takeaways
The evaluation matrix of the procurement office dictates the structure of the concept
A compelling bid concept answers the 'how' of service delivery
AI-supported text generation accelerates the first draft by up to 60 percent
Quality assurance requires a systematic comparison with the suitability criteria
Introduction
A Bid Manager sits in front of an empty document on a Friday evening and has to design the methodology for a complex IT project. When you write a concept for a tender, this document largely determines the award once the suitability criteria are met. With an annual contract volume of 500 billion euros in the German public sector (Source: Public Procurement Growth Engine), every lost concept directly means lost revenue.
Contents
How can you write a compelling bid concept?
Which requirements dictate the tender concept structure?
How can bidders adapt a concept-based tender template?
Why should teams generate tender text with AI?
When can you automatically create a tender concept tender by tender?
Checklist: Writing a concept
Conclusion
Frequently Asked Questions about writing a tender concept
How Forgent approaches this
How can you write a compelling bid concept?
To write a successful bid concept, bidders must exactly map the requirements of the procurement office. According to the provisions of the Act against Restraints of Competition (GWB) in § 97 GWB, public contracts are subject to the principle of economic efficiency. In practice in 2025, this means that the best price-performance ratio wins, not the lowest price.
The evaluation matrix of the authority dictates which aspects are included in the scoring and with how many points. An analysis by the Competence Center for Innovative Procurement (KOINNO) shows that qualitative criteria often account for up to 60% of the total score for complex services. Bidders must therefore describe methodological approaches, project plans, and quality assurance measures in detail.
"The evaluation matrix of the procurement office is the only standard by which your text is measured. Those who write past the grid lose valuable points." — Dr. Thomas Weber, procurement law expert
A common mistake in bid creation is the mere repetition of the scope of work. According to Directive 2014/24/EU (Article 67), the contracting authority expects a concrete solution approach for the described problem. The evaluation matrix dictates the content framework.
Which requirements dictate the tender concept structure?
The right tender concept structure strictly follows the outline specified by the contracting authority in the procurement documents. If the evaluation matrix defines four main criteria, each with three sub-criteria, your table of contents must reflect exactly these 12 points. A decision by the Federal Court of Justice (BGH X ZB 18/13) clarifies that contracting authorities may apply strict formal standards.
Begin each chapter with a short summary that gets to the core of your approach in a maximum of 50 words. According to a 2023 survey by the German Procurement Network (DVNW), evaluators in large procedures often read documents with more than 100 pages per bidder. Clear visual guidance through bold text and bullet points significantly facilitates the awarding of points.
Integrate proofs and references directly at the point where the respective criterion is evaluated. The Procurement and Contract Procedures for Building Works (VOB/A) requires clear proofs of suitability in § 6a VOB/A, which evaluators must find without long searches. A clear structure prevents point deductions.

How can bidders adapt a concept-based tender template?
Those who want to adapt a concept-based tender template should critically examine standardized text modules. According to a 2024 survey by the industry association Bitkom, 68% of IT service providers use basic templates for their bids. These templates cover formal aspects but must strictly be tailored to the specific needs of the respective procurement office.
The adaptation process requires a systematic comparison of standard text and individual requirements, which, according to empirical values from the Association for Supply Chain Management, Procurement and Logistics (BME), often takes two working days for a 30-page document. The following table shows how bidders translate generic statements into evaluable facts.
Criterion (Weighting) | Generic Template | Adapted Concept (Example) |
|---|---|---|
Project Management (30%) | We use agile methods. | We use Scrum with 2-week sprints and 4 dedicated roles. |
Quality Assurance (20%) | Quality is important to us. | 3-stage QA process according to ISO 9001 with weekly audits. |
Response Time (15%) | We respond quickly. | Guaranteed response time of 4 hours via our 24/7 ticket system. |
Tip: Use the four-eyes principle and have a colleague check the document against the evaluation matrix before you submit the bid via the procurement portal.
Avoid pure marketing phrases without measurable content. The Sector Ordinance (SektVO) requires transparent and comprehensible award criteria in § 52 SektVO, which the bidder must address with concrete performance indicators. The template serves only as a starting point.
Why should teams generate tender text with AI?
When teams generate tender text with AI, a clear qualitative difference in the technology used becomes apparent in practice. Generic AI like ChatGPT often fails due to the specific procurement language and, in the worst case, invents non-existent reference projects. A domain-specific AI, on the other hand, relies exclusively on verified company data and observes the strict formal requirements of procurement law.
The use of specialized systems fundamentally changes the distribution of roles in Bid Management, as a comparison of Buy beats Build across more than 700 legal teams shows. The AI extracts the evaluation criteria from the procurement documents and creates a structured first text draft. The Bid Manager then decides on the strategic direction of the document. The subject matter experts evaluate the proposed methodological approaches and finalize the technical details.
This division of labor significantly reduces the initial writing effort. According to a 2024 report by the magazine Beschaffungspraxis, teams save up to 15 hours per bid through this hybrid approach. The human retains full control.

When can you automatically create a tender concept tender by tender?
Those who want to scale automatically creating a tender concept tender by tender need a robust data infrastructure. Specialized tender AI handles the document volumes of complex EU-wide procurements—over 10,000 pages, 50+ files—without manual presorting steps.
The acceleration of processes enables companies to participate in significantly more procedures. As the HR service provider YER shows, bid decisions can be accelerated by 87.5%, which doubles processing capacity (Source: YER Case Study).
Quality assurance remains the decisive factor before final submission. A 2025 technical report by the Fraunhofer Institute emphasizes that automated text generation always requires final technical approval by certified experts. Automation secures the competitive advantage.
Checklist: Writing a concept
Step 1: Analyze procurement documents and evaluation matrix according to § 97 GWB.
Step 2: Align the table of contents exactly with the 4 to 6 main criteria of the contracting authority.
Step 3: Adapt standard templates and replace generic statements with 3 to 5 measurable facts.
Step 4: Have specialized AI tools generate the first text draft in under 2 hours.
Step 5: Conduct a technical review by 2 independent experts using the four-eyes principle.
Conclusion
Creating a compelling bid concept requires methodological precision and a deep understanding of the evaluation matrix. As the analysis of over 700 legal teams shows, the use of domain-specific AI massively accelerates the initial writing process. Bidders must individually adapt their templates and integrate measurable performance indicators to achieve the maximum 100 points. The combination of technological support and human subject matter expertise determines the award. Structure beats pure text volume.
Frequently Asked Questions about writing a tender concept
How do I write a concept for a project?
A concept for a project in the public sector is always based on the scope of work of the contracting authority. You start by extracting the evaluation criteria, which must be transparently specified according to § 97 GWB. You then structure the document exactly according to these requirements and substantiate every claim with concrete numbers, such as a guaranteed response time of 4 hours.
How can I write a concept that stands out from the competition?
Differentiation is achieved through specificity instead of marketing phrases. While 68% of bidders (according to Bitkom 2024) use generic templates, you score points with tailored solution approaches. Describe exactly which 3 methods you apply, who the 5 key people on the team are, and how you proactively minimize risks during the course of the project.
How do I write a concept with AI support?
Use domain-specific AI platforms to analyze the procurement documents and generate a structured rough draft. The AI often processes more than 50 files in a few minutes. The Bid Manager takes over this draft and enriches it with specific subject matter expertise, which reduces the processing time for the final document by up to 15 hours.
How Forgent approaches this
The manual creation of bid concepts often costs Bid Managers dozens of hours and ties up valuable resources in formatting. As a domain-specific AI platform for tenders, Forgent offers a fully-fledged Proposal Writer that accesses your company's own Knowledge Hub directly. The AI creates the 70-90% draft, allowing you to achieve 6-7x faster bid creation and scale your internal subject matter expertise. You still make the decision.